Water finds the weak point. We seal it.
Waterproofing, epoxy floors and concrete repair, from the basement raft to the roof. Approved applicator for Sika, MAPEI and Master Builders Solutions. Working in Abu Dhabi and Dubai since 2008.
- Head office
- Musaffah, Abu Dhabi
- Branch
- Motor City, Dubai
- Since
- 2008
- Certified
- ISO 9001 · 14001 · 45001
S-01Condition surveyTypical building, illustrative section, not to scale
D‑04Basements below the water tableOpen
Found: Wet patches and white salt bloom on basement walls, water at the kicker joint, and puddles on the B2 floor that come back after you mop them.
See the detailSix places water gets in
Every building leaks somewhere first. Pick a defect to see the build-up we install to stop it, layer by layer.
Basements below the water table
Build-up
- 1Blinding concrete
- 2PVC membrane with yellow signal layer
- 3Protection screed
- 4Reinforced raft
- 5Waterstop at the kicker joint
- 6Wall membrane and protection board
- 7Pile head treatment
- What you see
- Wet patches and white salt bloom on basement walls, water at the kicker joint, and puddles on the B2 floor that come back after you mop them.
- Why it happens
- Below the water table, groundwater pushes on the raft and walls all the time. It finds every unsealed joint, tie hole and pile head.
- What we install
- A continuous PVC, TPO or pre-applied membrane wrapped under the raft and up the walls, waterstops at every joint, and pile heads treated before the raft is cast.
- Systems we are approved to apply
- SikaProof P-1201
- Sikadur-Combiflex SG
- PVC and TPO sheet systems
- Henkel Polybit Bitustick
104 metres below Al Wathba
Pumping Station PS-01 on the Abu Dhabi STEP deep tunnel: a shaft taken 104 m below ground level, under constant groundwater pressure. We waterproofed it.
- Client
- Abu Dhabi Sewerage Services Company (ADSSC)
- Consultant
- Mott MacDonald
- Main contractor
- Construtora Norberto Odebrecht · City Projects
- Location
- Al Wathba North, Abu Dhabi
Scope
- External PVC waterproofing system for the underground structures
- Shaft waterproofing and drainage with a sheet membrane system
- Concrete injection works




111,000 m² of car park deck at Yas Mall
Three car parks at Yas Mall, coated for Aldar under SCAN Construction: the Hypermarket, Cinema and Grand Prix decks.



Also coated: Remal Mall parking in Al Ain, Al Muneera basement parking at Al Raha, and the JAFZA South accommodation.
Project register
A selection from our job references, with the main contractors who hired us.
20 projects shown
STEP Pumping Station PS-01, 104 m shaft
Al Wathba, Abu Dhabi
External PVC system, shaft membrane and drainage, injection
Main contractor: Odebrecht · City Projects
Qasr Al Hosn masterplan and CFB, Package 5
Abu Dhabi
PVC substructure, bituminous waterproofing, injection
Main contractor: Züblin
Jameel Arts Centre
Dubai
Roof and substructure waterproofing, injection
Main contractor: Strabag
Fujairah International Airport tunnel
Fujairah
Substructure waterproofing for the tunnel
Main contractor: FUJSENG Construction
Yas Mall car parks: Hypermarket, Cinema, Grand Prix
Yas Island, Abu Dhabi
Epoxy flooring, 111,000 m²
Main contractor: SCAN Construction
Arzana, five towers at Zayed Sports City
Abu Dhabi
PVC and TPO waterproofing, roofing
Main contractor: Silver Coast Innopave JV
Yas Island, Water's Edge
Yas Island, Abu Dhabi
PVC substructure, pile heads, water tanks, injection
Main contractor: Trojan General Contracting
Yas South infrastructure and public realm
Yas Island, Abu Dhabi
PVC substructure, superstructure, injection
Main contractor: Hilal Bil Badi & Partners
The Makers District, Plot P01
Al Reem Island, Abu Dhabi
PVC system, shaft drainage, pile head treatment, injection
Main contractor: China Construction Third Engineering Bureau
Corniche and Baynounah tunnels
Abu Dhabi
Tunnel waterproofing
Main contractor: Al Naboodah
Ruwais Housing Complex, ADNOC
Ruwais, Abu Dhabi
TPO internal lining for four water tanks
Main contractor: Al Nasr Contracting
RTA bus stations, Satwa and Oud Metha
Dubai
Roof waterproofing
Main contractor: RAQ Contracting
Park Ridge and Executive Residences, Dubai Hills Estate
Dubai
Roof waterproofing and epoxy works
Main contractor: Engineering Contracting Company (ECC)
Seven City, JLT (2B+G+5P+31)
Dubai
Substructure waterproofing, concrete injection
Main contractor: Airolink Building Contracting
Hatta pumped-storage hydro power plant
Hatta, Dubai
Injection works
Main contractor: Züblin
Emirates Steel factory
Abu Dhabi
Concrete injection and repair
Main contractor: Danieli
JAFZA South Accommodation, Phase 3
Jebel Ali, Dubai
Epoxy works
Main contractor: RAQ Contracting
Remal Mall basement parking
Al Ain
Epoxy coating, full basement parking
Main contractor: SCAN Construction
Al Mahra residential, Masdar City
Abu Dhabi
PolyUrea waterproofing
Main contractor: Guangsha International
ADSSC water tanks, Ras Al Ghumais
Abu Dhabi
TPO internal lining for four water tanks
Main contractor: General Construction Company
Our prequalification file lists more than 650 job references across the UAE. Ask for it with your tender.
Approved before we arrive on site
Consultants check the applicator before they check the product. These are the approvals we hold.
ISO 9001:2015
Quality management
ISO 14001:2015
Environmental management
ISO 45001:2018
Occupational health and safety
Certified by First Quality Certification.
Request our prequalification fileApproved applicator
- SikaSikaProof P-1201 · Sikadur-Combiflex SG · Sikalastic-560
- MAPEIWaterproofing and repair ranges
- Master Builders SolutionsMasterTop 1205 · 1210 · 1210CP · MasterSeal Traffic 1332
- Weber (Saint-Gobain)Waterproofing systems
- Henkel PolybitBitustick membranes · bitumen and non-bitumen coatings · epoxy
- MATEXFlooring, waterproofing and repair products
- AwazelApproved applicator, Dubai branch
- Dubai MunicipalityCertified applicator for sprayed PUR insulation (CL19020715)
How a repair runs
01
Inspect
An engineer visits, traces the water back to where it gets in, and records the defects with photos.
02
Propose
We recommend a system for the substrate, exposure and budget, and price it.
03
Submit
Method statement, risk assessment and material submittals go to the consultant for approval.
04
Apply
Trained crews apply the system to the manufacturer's procedure under our Zero Incident safety policy.
05
Test and hand over
Flood tests and inspections before the area is covered, then the handover documents.
Book a site inspection
Tell us what you are seeing and where. An engineer will call you back to arrange a visit.